Case Study: Container Legs in LNG Innovation
Logistics Business Magazine
NOVEMBER 27, 2019
There are two 45 cubic metre tanks present at the same time while a third tank is being filled. Mika Simola, Technical Manager of Rohe Solutions: “The starting point of the solution planning was to eliminate all separate container handling methods – e.g. reach stackers – from the container unloading area.
Let's personalize your content