Remove Conference Remove Document Remove Exercises Remove Maintainability
article thumbnail

Preparing for preparedness – how should we begin?

Logistics in War

For a long war, a larger and more costly logistic system needs to be built up, a training system maintained while combat is underway and sufficient trained personnel held in reserve to allow rotations into theatre.’. 3] Most logistics activities conducted during exercises primarily occur such that the exercise can actually be conducted!

article thumbnail

Building a better prepared Australian Defence Force after the Defence Strategic Review – supply-chains and logistics and the way in which both improve military resilience

Logistics in War

This is the third and final part of a presentation given at the Australian – New Zealand Defence Logistics Conference during June 2023. National Defence’s emphasis on logistics is clearly more than usual when compared to other Government policy documents of recent years, though this emphasis comes from an exceptionally low base.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Preparing for preparedness – how should we begin?

Logistics in War

For a long war, a larger and more costly logistic system needs to be built up, a training system maintained while combat is underway and sufficient trained personnel held in reserve to allow rotations into theatre.’. 3] Most logistics activities conducted during exercises primarily occur such that the exercise can actually be conducted!

article thumbnail

Vendor Managed Inventory Model for Supply Chain Cost Reductions

GlobalTranz

A means of optimizing Supply Chain performance in which the manufacturer is responsible for maintaining the distributor’s inventory levels. The distributor maintains the inventory plan. The manufacturer is responsible for creating and maintaining the inventory plan. What is Reverse Marketing?

article thumbnail

Successful TMS Implementations Begin 6 Months Before Project Kick-off

Talking Logistics

It begins with a strategy project that documents the current state process, information, and data flows. They will track tasks, keep resources focused, maintain the budget consumption, and ensure that milestones are met throughout this slog. Whether it is 3, or 4, or 5 phases in a project, this helps maintain a macro-level focus.